Folsom Flats
Status | Under Construction - July 2026
Location | 16 S 800 W, Salt Lake City, UT
Building Size | 214,865 SF
Site Size | 90,169 SF
Number of Units | 188
Design Schedule | May 2021 - January 2023
Every successful project is the result of teams of talented people working together in order to make the project a success. The owners and stakeholder groups play a huge role in defining the goals and objectives of the project. It is their vision for what they want to accomplish that really allows us to be successful in our work. Architects and Engineers make up the design team that is responsible for planning out and documenting everything that goes into making a building. Once the project is fully documented it is then in the hands of skilled craftsmen and trade workers who make up the construction team that physically brings the design into existence.
We would like to thank all of those who worked on this project to make our vision a reality by giving credit here with links to their websites.
A Collaborative Effort
Design Team
Structural | Canyons Structural
Mechanical | Shakespeare Engineering
Electrical | Elemental Electrical Engineers
Civil | Wilding Engineering
Interiors | Studio B Design Group
Construction Team
General Contractor | Bonneville Builders
Stakeholders
Owner | TAG SLC