Folsom Flats

Status | Under Construction - July 2026

Location | 16 S 800 W, Salt Lake City, UT

Building Size | 214,865 SF

Site Size | 90,169 SF

Number of Units | 188

Design Schedule | May 2021 - January 2023

Every successful project is the result of teams of talented people working together in order to make the project a success. The owners and stakeholder groups play a huge role in defining the goals and objectives of the project. It is their vision for what they want to accomplish that really allows us to be successful in our work. Architects and Engineers make up the design team that is responsible for planning out and documenting everything that goes into making a building. Once the project is fully documented it is then in the hands of skilled craftsmen and trade workers who make up the construction team that physically brings the design into existence.  

We would like to thank all of those who worked on this project to make our vision a reality by giving credit here with links to their websites.

A Collaborative Effort

Design Team

Structural | Canyons Structural

Mechanical | Shakespeare Engineering

Electrical | Elemental Electrical Engineers

Civil | Wilding Engineering

Interiors | Studio B Design Group

Construction Team

General Contractor | Bonneville Builders

Stakeholders

Owner | TAG SLC